This iconic structure located at the heart of London’s Olympic Park hosted the swimming and diving events at London’s 2012 Olympic Games. As well as doorsets and general joinery to the pool and back of house areas, we carried out first fix carpentry works to the temporary stands, Olympic staircases, lift shafts and curved balustrades.